This website requires JavaScript.
Explore
Help
Register
Sign In
builtbykev
/
vyndr
Watch
1
Star
0
Fork
0
You've already forked vyndr
Code
Issues
Pull Requests
Actions
7
Packages
Projects
Releases
Wiki
Activity
All Workflows
security-scan.yml
vyndr-morning-odds.yml
vyndr-nightly.yml
vyndr-pregame.yml
vyndr-reporter-poll.yml
vyndr-weather.yml
182 workflow runs
Actor
All actors
Status
All status
Success
Failure
Waiting
Running
Handoff doc: ground-truth build state at
71d3b7b
#312
:
Scheduled
main
2026-08-08 22:00:34 +00:00
0s
View workflow file
Handoff doc: ground-truth build state at
71d3b7b
#311
:
Scheduled
main
2026-08-08 20:00:34 +00:00
0s
View workflow file
Media/hub design inventory: the specs already exist, and so does a gap audit
#308
:
Scheduled
main
2026-08-07 23:30:34 +00:00
0s
View workflow file
Content engine: posts that structurally cannot lie
#307
:
Scheduled
main
2026-08-07 22:00:34 +00:00
0s
View workflow file
Board: mechanical inventory of every outstanding item, read from the repo
#306
:
Scheduled
main
2026-08-07 20:00:34 +00:00
0s
View workflow file
Retain raw weather, and record platoon severity 48 rows short
#303
:
Scheduled
main
2026-08-08 04:23:34 +00:00
0s
View workflow file
Retain raw weather, and record platoon severity 48 rows short
#302
:
Scheduled
main
2026-08-07 22:23:34 +00:00
0s
View workflow file
Retain raw weather, and record platoon severity 48 rows short
#301
:
Scheduled
main
2026-08-07 22:23:34 +00:00
0s
View workflow file
Retain raw weather, and record platoon severity 48 rows short
#298
:
Scheduled
main
2026-08-07 04:23:34 +00:00
0s
View workflow file
Retain raw weather, and record platoon severity 48 rows short
#297
:
Scheduled
main
2026-08-06 22:23:34 +00:00
0s
View workflow file
Retain raw weather, and record platoon severity 48 rows short
#296
:
Scheduled
main
2026-08-06 22:23:34 +00:00
0s
View workflow file
Calibrate hits point-in-time: partial pass, and an honest ceiling of 0.667
#293
:
Scheduled
main
2026-08-05 22:23:34 +00:00
0s
View workflow file
Split infield defence out, and pre-register the DRIVER/CATALYST/SINKER batch
#292
:
Scheduled
main
2026-08-05 22:23:34 +00:00
0s
View workflow file
Build the pitcher engine, and find the cap was eating the whole board
#289
:
Scheduled
main
2026-08-05 04:23:34 +00:00
0s
View workflow file
Measure the batter cluster: the proven set is empty, and hits is closed
#288
:
Scheduled
main
2026-08-04 22:23:34 +00:00
0s
View workflow file
Build the gate, run it, and find we were proving things on the wrong stat
#287
:
Scheduled
main
2026-08-04 22:23:34 +00:00
0s
View workflow file
Record the hits-v1 fingerprint as PENDING, and why
#283
:
Scheduled
main
2026-08-04 04:23:34 +00:00
0s
View workflow file
Structural hardening: unknown-is-not-zero + takeability-is-book-identity
#282
:
Scheduled
main
2026-08-03 22:23:34 +00:00
0s
View workflow file
Takeable enforcement: verified on real rows, 1,006 tagged, re-stamp call ready
#281
:
Scheduled
main
2026-08-03 22:23:34 +00:00
0s
View workflow file
arch-v1 axis audit: env/matchup were dead; environment fixed
#278
:
Scheduled
main
2026-08-03 04:23:34 +00:00
0s
View workflow file
arch-v1 axis audit: env/matchup were dead; environment fixed
#277
:
Scheduled
main
2026-08-02 22:23:34 +00:00
0s
View workflow file
arch-v1 axis audit: env/matchup were dead; environment fixed
#276
:
Scheduled
main
2026-08-02 22:23:34 +00:00
0s
View workflow file
Build 2 Phase B: checkout claims atomically, webhook finalizes, bypass retired
#273
:
Scheduled
main
2026-08-02 04:23:34 +00:00
0s
View workflow file
Build 2 Phase A: real founder cap — atomic claim, race PROVEN, flags collapsed
#272
:
Scheduled
main
2026-08-01 22:23:34 +00:00
0s
View workflow file
report: Build 2 Review Zero — payment mechanism BLOCKED, no Stripe credentials
#271
:
Scheduled
main
2026-08-01 22:23:34 +00:00
0s
View workflow file
report: C1 takeable-floor derivation — CANNOT DERIVE (every bucket CI spans zero)
#268
:
Scheduled
main
2026-08-01 04:23:34 +00:00
0s
View workflow file
report: C1 takeable-floor derivation — CANNOT DERIVE (every bucket CI spans zero)
#267
:
Scheduled
main
2026-07-31 22:23:34 +00:00
0s
View workflow file
docs: top-graded selector fingerprinted — strip-after-rank boundary proven in prod
#266
:
Scheduled
main
2026-07-31 22:23:34 +00:00
0s
View workflow file
docs: hero ranking fix verified (new code serving — max-p_win takeable, chalk excluded)
#263
:
Scheduled
main
2026-07-31 04:23:34 +00:00
0s
View workflow file
docs: hero ranking fix verified (new code serving — max-p_win takeable, chalk excluded)
#262
:
Scheduled
main
2026-07-30 22:23:34 +00:00
0s
View workflow file
First
Previous
1
2
3
4
5
...
Next
Last