builtbykev
7a925f43eb
Model Train arc 1 (engine): de-vig + EV + takeable/value gates + hero v2 + triplet
...
Steps 1-6 — make "real opportunities at takeable prices" the engine, not a filter.
1. DE-VIG (src/utils/devig.js): two-way multiplicative de-vig strips the vig and
returns fair prob + fair price per side + the overround. One side missing →
fair UNAVAILABLE (null), never faked. Method noted in code + the `devig_method`
field.
2. EV (devig.evPct): ev_pct = model prob × decimal − 1 at the graded side's
ACTUAL price. This is the ranking signal now, replacing raw |model−consensus|.
3. TAKEABLE gate (src/config/valueEngine.js, TAKEABLE_ODDS_CEILING −160 .. +200,
env-tunable): promoted surfaces only (hero/featured/alerts). The full board
still shows everything; Parlay Lab exempt; JUICE_ODDS_FLOOR (−400) stays the
absolute backstop underneath. Strict null-guard (Number(null)===0 would have
made a missing price "takeable").
4. VALUE flag: passes BOTH gates (takeable AND ev_pct ≥ VALUE_EV_THRESHOLD).
Grade = read quality; value = the price pays you. Shipped in payloads.
5. HERO v2 (heroPropService): highest ev_pct among takeable A/B reads — a huge
gap on a −900 line is trivia, not an opportunity.
6. VALUE TRIPLET: book_odds · fair_odds · model_odds on every read (snapshot,
hero, scan — they all spread the grade). Handoff documents the fields; the
rendering is Session-2 Design's job.
All wired in analyzeViaEngine1's existing p_win/kelly block (real quantile
probability × real book odds, or nothing). 33 new tests; suite 276/3306 green.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-07-19 02:43:30 -04:00
..
2026-06-08 18:35:13 -04:00
2026-06-11 03:48:07 -04:00
2026-03-21 14:21:34 -04:00
2026-06-10 13:24:11 -04:00
2026-07-10 21:34:26 -04:00
2026-07-10 21:34:26 -04:00
2026-06-10 19:41:37 -04:00
2026-07-16 17:01:48 -04:00
2026-06-18 20:15:38 -04:00
2026-07-12 23:41:13 -04:00
2026-07-13 03:48:58 -04:00
2026-06-13 12:37:08 -04:00
2026-07-11 14:28:18 -04:00
2026-07-11 14:28:18 -04:00
2026-07-18 13:55:39 -04:00
2026-07-12 13:42:18 -04:00
2026-03-21 14:21:34 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-07-18 01:29:55 -04:00
2026-07-13 16:58:22 -04:00
2026-07-13 16:58:22 -04:00
2026-07-13 16:58:22 -04:00
2026-07-18 01:52:37 -04:00
2026-06-11 16:21:18 -04:00
2026-06-10 14:50:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-13 21:30:57 -04:00
2026-06-13 21:30:57 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-03-21 12:45:15 -04:00
2026-06-18 20:15:38 -04:00
2026-06-18 20:15:38 -04:00
2026-07-18 01:42:16 -04:00
2026-07-19 02:43:30 -04:00
2026-07-12 19:25:32 -04:00
2026-07-13 00:07:06 -04:00
2026-07-12 19:45:07 -04:00
2026-07-17 15:26:49 -04:00
2026-07-17 01:34:01 -04:00
2026-07-10 20:17:49 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-18 15:38:06 -04:00
2026-07-13 11:44:15 -04:00
2026-07-13 18:44:57 -04:00
2026-07-13 18:12:31 -04:00
2026-07-14 00:21:59 -04:00
2026-07-13 13:18:59 -04:00
2026-07-13 18:12:31 -04:00
2026-07-11 00:47:01 -04:00
2026-06-08 18:35:13 -04:00
2026-07-13 18:44:57 -04:00
2026-06-10 19:41:37 -04:00
2026-06-10 14:50:13 -04:00
2026-06-08 18:35:13 -04:00
2026-07-16 11:26:00 -04:00
2026-07-13 23:27:19 -04:00
2026-07-13 23:33:26 -04:00
2026-06-10 19:41:37 -04:00
2026-06-10 03:37:07 -04:00
2026-07-13 14:36:28 -04:00
2026-06-15 18:21:32 -04:00
2026-06-08 18:35:13 -04:00
2026-07-13 13:18:59 -04:00
2026-06-08 18:35:13 -04:00
2026-07-19 02:43:30 -04:00
2026-06-08 18:35:13 -04:00
2026-06-12 11:16:58 -04:00
2026-07-17 03:15:50 -04:00
2026-06-10 22:24:40 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-10 20:45:05 -04:00
2026-07-11 20:08:24 -04:00
2026-03-21 11:41:18 -04:00
2026-06-18 20:15:38 -04:00
2026-07-11 20:08:24 -04:00
2026-07-17 16:08:18 -04:00
2026-07-17 16:08:18 -04:00
2026-03-21 14:21:34 -04:00
2026-06-08 18:35:13 -04:00
2026-06-13 12:37:08 -04:00
2026-07-12 00:45:29 -04:00
2026-07-12 00:45:29 -04:00
2026-07-13 14:59:44 -04:00
2026-07-11 14:31:35 -04:00
2026-03-21 14:21:34 -04:00
2026-06-08 18:35:13 -04:00
2026-06-11 16:21:18 -04:00
2026-07-17 03:06:12 -04:00
2026-06-08 18:35:13 -04:00
2026-06-19 01:45:36 -04:00
2026-06-18 23:56:26 -04:00
2026-07-13 03:48:58 -04:00
2026-07-11 00:59:17 -04:00
2026-06-19 15:45:07 -04:00
2026-06-19 10:20:55 -04:00
2026-06-19 02:42:13 -04:00
2026-06-18 15:38:06 -04:00
2026-07-17 03:15:50 -04:00
2026-07-11 14:29:22 -04:00
2026-07-13 23:33:26 -04:00
2026-07-13 23:27:19 -04:00
2026-06-15 18:21:32 -04:00
2026-06-10 03:37:07 -04:00
2026-03-22 05:11:42 -04:00
2026-06-08 18:35:13 -04:00
2026-07-13 16:58:22 -04:00
2026-07-13 23:33:26 -04:00
2026-06-08 18:35:13 -04:00
2026-06-12 02:41:51 -04:00
2026-06-14 22:29:01 -04:00
2026-06-12 02:41:51 -04:00
2026-06-19 10:20:55 -04:00
2026-06-08 18:35:13 -04:00
2026-07-11 14:34:45 -04:00
2026-07-13 22:30:50 -04:00
2026-07-10 17:00:29 -04:00
2026-07-13 14:59:44 -04:00
2026-06-11 16:21:18 -04:00
2026-06-11 16:21:18 -04:00
2026-06-12 02:06:22 -04:00
2026-06-19 15:45:07 -04:00
2026-03-21 12:45:15 -04:00
2026-07-13 14:36:28 -04:00
2026-06-19 11:25:14 -04:00
2026-06-10 09:28:30 -04:00
2026-06-13 12:37:08 -04:00
2026-07-11 14:28:18 -04:00
2026-07-11 14:28:18 -04:00
2026-06-08 18:35:13 -04:00
2026-03-22 05:11:42 -04:00
2026-03-22 05:11:42 -04:00
2026-07-10 17:00:29 -04:00
2026-07-10 22:24:47 -04:00
2026-07-13 16:02:16 -04:00
2026-07-17 01:07:28 -04:00
2026-06-18 20:15:38 -04:00
2026-06-18 23:56:26 -04:00
2026-06-18 20:15:38 -04:00
2026-06-19 01:45:36 -04:00
2026-06-18 23:56:26 -04:00
2026-06-18 20:15:38 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-18 23:56:26 -04:00
2026-06-19 02:42:13 -04:00
2026-07-11 14:24:41 -04:00
2026-06-14 22:29:01 -04:00
2026-06-08 18:35:13 -04:00
2026-07-11 19:38:37 -04:00
2026-07-15 18:07:14 -04:00
2026-06-12 11:16:58 -04:00
2026-07-11 19:32:22 -04:00
2026-06-13 10:57:49 -04:00
2026-07-15 18:07:14 -04:00
2026-07-19 02:09:11 -04:00
2026-06-08 18:35:13 -04:00
2026-06-10 03:12:20 -04:00
2026-06-10 01:22:55 -04:00
2026-06-11 21:22:59 -04:00
2026-06-08 18:35:13 -04:00
2026-06-12 17:58:55 -04:00
2026-07-16 21:27:47 -04:00
2026-07-13 16:02:16 -04:00
2026-07-12 19:25:32 -04:00
2026-07-11 14:24:41 -04:00
2026-03-21 10:58:58 -04:00
2026-06-08 18:35:13 -04:00
2026-07-11 20:08:24 -04:00
2026-06-08 18:35:13 -04:00
2026-06-10 20:45:05 -04:00
2026-06-18 11:12:24 -04:00
2026-06-18 15:38:06 -04:00
2026-06-18 20:15:38 -04:00
2026-07-19 00:19:23 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-03-21 11:41:18 -04:00
2026-06-08 18:35:13 -04:00
2026-07-11 14:28:18 -04:00
2026-07-10 22:24:47 -04:00
2026-06-18 20:15:38 -04:00
2026-07-11 19:32:17 -04:00
2026-07-17 15:26:49 -04:00
2026-06-19 13:55:39 -04:00
2026-07-17 15:26:49 -04:00
2026-06-10 14:50:13 -04:00
2026-06-10 20:45:05 -04:00
2026-06-10 14:50:13 -04:00
2026-06-16 14:37:07 -04:00
2026-06-10 14:50:13 -04:00
2026-06-11 18:15:25 -04:00
2026-06-19 14:25:05 -04:00
2026-07-15 18:07:14 -04:00
2026-07-13 16:58:22 -04:00
2026-06-08 18:35:13 -04:00
2026-06-12 15:45:19 -04:00
2026-07-17 01:42:03 -04:00
2026-06-12 11:16:58 -04:00
2026-06-08 18:35:13 -04:00
2026-06-18 11:12:24 -04:00
2026-07-11 00:39:18 -04:00
2026-06-12 11:16:58 -04:00
2026-07-18 23:04:19 -04:00
2026-06-08 18:35:13 -04:00
2026-07-11 14:34:45 -04:00
2026-06-11 10:06:49 -04:00
2026-06-12 11:16:58 -04:00
2026-06-10 19:41:37 -04:00
2026-06-11 16:21:18 -04:00
2026-07-13 00:31:35 -04:00
2026-06-19 15:45:07 -04:00
2026-06-08 18:35:13 -04:00
2026-07-17 15:26:49 -04:00
2026-06-18 21:34:29 -04:00
2026-06-10 13:24:11 -04:00
2026-07-13 13:58:01 -04:00
2026-07-11 14:24:41 -04:00
2026-06-08 18:35:13 -04:00
2026-06-10 14:50:13 -04:00
2026-03-21 12:45:15 -04:00
2026-07-19 02:43:30 -04:00
2026-07-17 15:26:49 -04:00
2026-07-10 20:17:49 -04:00
2026-07-11 14:31:53 -04:00
2026-07-16 16:19:30 -04:00
2026-07-17 15:26:49 -04:00
2026-07-17 15:26:49 -04:00
2026-06-16 01:04:37 -04:00
2026-07-10 20:17:49 -04:00
2026-06-11 16:21:18 -04:00
2026-06-08 18:35:13 -04:00
2026-06-08 18:35:13 -04:00
2026-06-10 14:50:13 -04:00