e3ca1650d9
Consolidation only. Nothing built, wired or promoted. NOTHING WAS RE-VERIFIED and no query was run — all 22 artifacts produced this session plus the completion matrix were taken as KNOWN, per the order's own clause. The verification ledger at the top of the plan lists exactly what was taken as known and which four items remain genuinely open (sport order, board-reasoning gating, the CLV flag, team colours) — each open because it needs a decision or a build, not a query. The plan captures all six tracks in one document: per-sport models (MLB's 8-layer stack with each layer marked BUILT/PARTIAL/NOT-WIRED, plus the sport order), design implementation (61 catalogued items), surfaces, the resolution tail, the sport boundary, and the Chrome audit. The through-line it makes visible: MLB's layers 2, 3, 5 and 6 are BUILT AND NOT CONNECTED, while layer 8 (the grade ladder) is connected and meaningless (r~0.005, inverted). MLB's fix is connection, not construction. Phasing is by dependency: MLB model truth -> resolution tail -> surfaces/design (parallel lane) -> sport boundary -> sport rollout (one order per sport) -> monetization finish -> Chrome audit and hardening. ~23 orders total, ~11 unblocked today, so "how many sessions left" now has a real answer. DEFINITION OF DONE is explicit and countable: MLB layers 1-8 connected with a monotone held-out-proven ladder; every listed sport finished on the same template or explicitly abstaining with its reason recorded; all 61 design items built; every surface reachable and honest; the resolution pipeline firing end-to-end; the sport boundary a registry; the Chrome audit passed; and the record publishable on its own terms with no claim outrunning its evidence. STATE.md now points at the plan and is demoted to history. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01QJs13VsyiSKYQP6rj3NNmc